BAKERSFIELD, Calif. — Traffic control is scheduled for Real Road Thursday as the contractor for the Centennial Corridor Mainline is set to pour concrete for one of the new bridges.
The traffic control is scheduled to begin at 8 a.m. and last until 5 p.m. Thursday.
Flagging personnel will be stopping traffic for up to five minutes at a time while this work is underway. Drivers should plan to use alternate routes, if possible, or allow sufficient time to reach their destinations if they must use Real Road during this time period.